Half-hourly meters explained for business: what they are and why they matter

Illustration of Bes the bloodhound pointing at a half-hour clock face next to a smart meter and a small bar chart

If your electricity bill mentions half-hourly data, a half-hourly meter or an MPAN starting 05 to 08, you are in a slightly different corner of the market from a business on a basic meter. It is also a corner that is growing, because the whole electricity system is being moved onto half-hourly settlement.

This guide explains in plain English what that means, how to check what you are on, and why it affects how your usage is measured and billed. We are an introducer, not an adviser, so we explain what the sources say and leave the decisions with you.

The short version

  • Settlement is how the electricity industry reconciles what suppliers buy with what customers use. Half-hourly settlement uses actual consumption in each half hour.
  • Ofgem says you can check if you are half-hourly settled from your Meter Point Administration Number (MPAN): if it starts 05, 06, 07 or 08, your supplier is taking half-hourly readings.
  • From 1 April 2017, all medium and large businesses had to be settled half-hourly. An industry-wide move for everyone else is under way.
  • Elexon says migration began in October 2025, about 80% of meters should be accepted by October 2026, and implementation completes in May 2027.
  • More detailed data can help a business see when it uses electricity, and may open the door to time-of-use tariffs.

What is settlement, and why half-hourly?

Ofgem’s description is a good starting point. Settlement is the process for charging suppliers for the difference between how much electricity they buy and how much their customers actually use. Traditionally, suppliers have estimated customers’ use based on the average customer’s pattern, and settlement then reconciles any discrepancies.

With smart meters that record consumption every half hour and transmit it, the industry can use real figures instead of estimates. Ofgem says this gives suppliers a much more accurate picture of consumption and demand, so they can match their purchases accordingly and bill customers more accurately, based more closely on the cost of generating and supplying the electricity they use.

Bes the bloodhound, in a deerstalker, pointing a finger
Half-hourly means real use, measured every thirty minutes.

How to tell if your business is half-hourly settled

Ofgem gives a simple check. Look at your Meter Point Administration Number (MPAN), also called the supply number, on your electricity bill. If the first two digits are 05, 06, 07 or 08, your supplier is taking half-hourly readings from your meter.

What to look atWhat it tells you
MPAN / supply number on your billFirst two digits 05, 06, 07 or 08 means half-hourly readings (Ofgem)
Meter type on your billOfgem’s billing guide says suppliers should tell you if you have a traditional, automated meter reading (AMR) or smart meter, and whether you can upgrade
Reading type on your billBills should show whether readings are estimated or actual (Ofgem billing guide)

If you cannot find your MPAN, your supplier can tell you. Ofgem says suppliers must put your supply number on each bill or statement.

Who has had to be half-hourly, and since when?

Ofgem says that from 1 April 2017 all medium and large businesses must be settled on their half-hourly electricity use. In the industry this is known as code modification P272. The aim was for businesses to have detailed usage information they can use to shop around for a supplier offering value for their specific needs, and for suppliers to offer time-of-use tariffs that reward moving consumption away from peak periods.

From July 2017 Ofgem also made it easier for suppliers to settle small business and household customers half-hourly. Since then, the direction of travel has been towards everyone.

The market-wide switchover (2025 to 2027)

Elexon, the body Ofgem appointed to implement the reform, calls Market-wide Half-Hourly Settlement one of the biggest changes to the electricity retail market since competition began in the late 1990s. Its published timeline says:

  • Central systems were ready for migrating meter points in September 2025.
  • Suppliers began migrating customers’ meters to half-hourly settlement from 22 October 2025.
  • Elexon expects to have accepted approximately 80% of meters into the new arrangements by October 2026.
  • Implementation completes in May 2027.

Elexon says that once half-hourly settlement is fully implemented, the time to complete settlement reduces from 14 months to four. It also says granular consumption data can be used by suppliers to develop products that reward consumers for being more flexible in how they use electricity, and that consumer consent controls are being developed so people can manage who can see their data.

For most businesses this change happens in the background. The practical point is to keep your meter details and contact information up to date with your supplier, and ask them if you are unsure how your site is being settled.

What does half-hourly data mean for your business?

Ofgem says half-hourly data means households and businesses know how much electricity they are using, and can choose to use more or less in response if they wish. That might suit them if they want to avoid times of day when electricity is expensive to generate, when generation relies on fossil fuels, when many others want electricity, or when networks are strained.

Possible benefits

  • Visibility. You can see when you use electricity, not only how much in total. Ofgem says billing based on real use is more accurate.
  • Time-of-use tariffs. Ofgem describes smart tariffs as price signals where lower prices reflect lower cost of generating and moving electricity at certain times. Prices are lower when there is lots of wind and solar, and higher when more expensive generation is in use.
  • Support for flexibility. Ofgem says technology like energy storage can shift use or respond to price, for example a battery recharging when electricity is cheap.

Things to keep in mind

  • Whether you benefit depends on when your business uses power and whether you can move any of it.
  • Not every supplier offers every tariff type. Ask what is on offer for your meter type.
  • Check how your contract treats network and other non-energy costs, which Ofgem says make up part of a business bill.
Bes the bloodhound with a phone showing an upload arrow, ready to send a bill
Your bill shows your MPAN and meter type.

Questions to ask about your meter

  1. Is my site half-hourly settled? Check the first two digits of your MPAN.
  2. What type of meter do I have? Traditional, AMR or smart.
  3. Are my readings actual or estimated? Ofgem says to submit regular readings or get a smart meter so you pay only for what you use.
  4. Do I have access to my half-hourly data? Ask your supplier what you can see.
  5. Do the quotes I am given take my usage pattern into account? Ask for the tariff structure and compare against your own bill.

A short glossary

TermPlain meaning
MPANMeter Point Administration Number, the supply number on an electricity bill
kWhKilowatt hour, the unit your energy is billed in
SettlementThe industry process that reconciles the electricity suppliers buy with what customers use (Ofgem)
Half-hourly settlementSettlement based on actual use in each half hour (Elexon)
P272The code change that made half-hourly settlement mandatory for medium and large businesses from 1 April 2017 (Ofgem)
MHHSMarket-wide Half-Hourly Settlement, the programme moving the whole market, due to complete in May 2027 (Elexon)
AMRAutomated meter reading, one of the meter types suppliers should tell you about (Ofgem billing guide)
Smart tariffPrices that vary by time to reflect generation and transport costs (Ofgem)

Usage data and your bill

Ofgem’s billing guide says suppliers should tell customers what type of meter they have, and may note whether a customer can upgrade. It says a usage graph on the bill can help customers relate their energy use to their readings and costs, and that suppliers have to reflect readings in bills. If you are on a half-hourly meter, ask your supplier what usage detail is available to you, such as a portal or reports, and how often it updates.

Elexon also says that, from October 2026, it will begin publishing aggregated data from meters that have moved to the new arrangements, as part of work to make data available to support innovation. That is aggregated data about the market, not data about your site.

Frequently asked questions

What is a half-hourly meter?

A meter that records electricity use every half hour. Ofgem says that if the first two digits of your MPAN are 05, 06, 07 or 08, your supplier takes half-hourly readings from your meter.

What is half-hourly settlement?

The process of reconciling the electricity suppliers buy with what customers use, based on consumption in each half hour instead of estimates or monthly readings. Elexon describes it this way.

What is an MPAN?

A Meter Point Administration Number, also called a supply number. It is on your electricity bill, and suppliers must show it on each bill or statement, according to Ofgem.

Since when have businesses had to be half-hourly settled?

Ofgem says from 1 April 2017 all medium and large businesses must be settled half-hourly. Smaller businesses and households are being moved in the market-wide programme.

When does the market-wide change finish?

Elexon says implementation completes in May 2027, with about 80% of meters accepted by October 2026.

Will half-hourly settlement lower my bill?

Ofgem says it should lead to more accurate billing and may allow time-of-use tariffs that reward shifting use. Whether you save depends on your usage pattern and contract.

What is a time-of-use tariff?

A tariff with prices that change at different times of day. Ofgem says lower prices reflect lower generating and transport costs at certain times, such as when there is plenty of wind and solar.

Do I need a smart meter?

Ofgem says regular meter readings or a smart meter help make sure you only pay for what you use. Ask your supplier what is available for your site.

Who can see my half-hourly data?

Elexon says consent controls are being developed so consumers can grant and manage consent to share their energy data. Ask your supplier about its policy.

Where do I find out which settlement I am on?

Your bill shows your MPAN. Your supplier can confirm how your site is settled.

Bes the bloodhound with a phone showing an upload arrow, ready to send a bill

Not sure what your meter details mean for your quotes?

Send us your latest bill. We introduce you to our energy partner, who gathers quotes and options from 50+ suppliers. You compare them and make the call. Absolutely no cost to you. It’s a free service.

Send us your latest bill

Where this comes from

This article is general information, not energy advice. Business Energy Solutions is an introducer: we do not give advice or recommendations. Check your own contract and bill for the details that apply to you. Facts were checked against the sources above in October 2026; rules and rates change, so check the latest before you act.